[1]
Nurani, B.M.C. et al. 2025. Pengaruh Availability Dan Effective Time terhadap Biaya Pemeliharaan Alat Automatic Stacking Crane (ASC) di PT Terminal Teluk Lamong. QISTINA: Jurnal Multidisiplin Indonesia. 4, 1 (Jun. 2025), 270–276. DOI:https://doi.org/10.57235/qistina.v4i1.6106.