Tinjauan Perhitungan Rencana Anggaran Biaya (RAB) Non-Struktur dan Penjadwalan Pada Pembangunan Kantor Kejaksaan Negeri Tual

Authors

  • Fathin Azzahra Suat Politeknik Negeri Ambon, Indonesia
  • La Mohamat Saleh Politeknik Negeri Ambon, Indonesia
  • Maslan Abdin Politeknik Negeri Ambon, Indonesia

DOI:

https://doi.org/10.57235/motekar.v4i1.8413

Keywords:

AHSP, Budget Plan, Critical Path Method, Construction Project

Abstract

Development is a continuous process carried out to improve the sosial and economic indicators of a region over time. One of the important stages in the emplementation of a construction project is the calculation of the Budget Plan (RAB), as it serves to answer question related to the total cost required for a building. In the construction project of the District Attomey’s Office, particularly as a public facility, budget planning is curcial to ensure the project runs according to plan. This study aims to determine the non-structural work budget using the Unit Price Analysis (AHSP) PUPR No.8 of 2023 and the 2024 Basic Price data, as well as to analyze the project duration using the Critical Path Method (CPM) and S-Curve method. The results of the study show that the estimated cost of non-structural work is IDR 1,538,390,000.00. For scheduling, the duration obtained was 5 months using the S-Curve method and 89 weeks using the CPM method. Thus, these findings provide a comprehensive overview of the cost and time requirements for the implementation of the Tual District Attorney’s Office construction project.

Downloads

Download data is not yet available.

References

Angelin, A., & Ariyanti, S. (2019). Analisis Penjadwalan Proyek New Product Development Menggunakan Metode Pert Dan Cpm. Jurnal Ilmiah Teknik Industri, 6(1), 63–70. https://doi.org/10.24912/jitiuntar.v6i1.3025

Ervianto, Wulfram I. 2005. Manajemen Proyek Konstruksi. Andi Offset, Yogyakarta.

Firmansyah. Achil Yoga Adi 2011, Rancang Bahan Aplikasi Rencana Anggaran Biaya dalam Pembangunan Rumah, STIKOM, Surabaya

Hadicara, D., & Rochim, A. (2023). Penggunaan Metode PERT dan CPM dalam Proyek Pembangunan Jalan. Pondasi, 28(1), 32–44. https://jurnal.unissula.ac.id/index.php/pondasi/article/view/30148

Harny Wally, 2013. Perhitungan Rencana Anggaean Biaya dan Waktu Pelaksanaan pada pembangunan gedung Kantor Fakultas Teknik Ukim Ambon. Perpustakaan Politeknik Negeri Ambon

J. A. Mukomoko. 1987. Dasar Penyusunan Anggaran Biaya Bangunan. Jakarta : Gaya Media Pratama

Mayasari, A. (2015). Penerapan Metode Pert Dan Cpm (Studi Pada Perusahaan Baja Sakti Construction). Doctoral Dissertation, UAJY, 1–60. http://e-journal.uajy.ac.id/7763/3/EM218536.pdf

Niron, John. W, 1992, RAB (Rencana Anggaran Biaya Bangunan) Cetakan X. CV, Asoma, JakartaAngelin, A., & Ariyanti, S. (2019). Analisis Penjadwalan Proyek New Product Development Menggunakan Metode Pert Dan Cpm. Jurnal Ilmiah Teknik Industri, 6(1), 63–70. https://doi.org/10.24912/jitiuntar.v6i1.3025

Rosmayati, I. (2023). Pelatihan Pembuatan Rencana Anggaran Biaya (RAB) Di Kelurahan Pananjung Kecamatan Tarogong Kaler Kabupaten Garut. Jurnal Pengabdian Masyarakat Akademisi, 1(2), 54–61. https://doi.org/10.59024/jpma.v1i2.180

Supusepa, A. D. D., Sumanti, F. P. Y., & Dundu, A. K. T. (2022). Analisis Rencana Anggaran Biaya Dan Waktu Pelaksanaan Pekerjaan Pada Pembangunan Gedung GKI Moses Wanggo Kecamatan Muara Tami, Jayapura. Tekno, 20(81), 169–178.